Product Details
Place of Origin: CHINA
Brand Name: YAOAN
Certification: CE
Model Number: AF-1000,1500
Payment & Shipping Terms
Minimum Order Quantity: 1
Packaging Details: WOODEN BOX
Delivery Time: 30-90 DAYS
Payment Terms: TT,LC
Supply Ability: 100 SETS PER MONTH
Material: |
LDPE |
Layer: |
3 |
Screw: |
65/95/65mm |
Warranty: |
1 Year |
LD: |
30:1 |
Capacity: |
180kg/h |
Material: |
LDPE |
Layer: |
3 |
Screw: |
65/95/65mm |
Warranty: |
1 Year |
LD: |
30:1 |
Capacity: |
180kg/h |
AF-65/90/65*1850MM Automatic High Speed Three Layer Or Five Layer Stretch Film / Cling Film Production Line
This machine is designed by YAOAN, to make LLDPE stretch film, cling film or wrapping film.
1.Feature:
1)It profits advanced technology from aboard and manufacture by absorption, improvement, innovation.
2)It is entire frequency conversion control, movement stable, highly effective and the low energy consumption.
3)The product adopts the craft of one time forming.
4)It can produce two-side sticks for stretching film.
Main technical parameter
Model | AF-65/90/65 |
Width of film | 1850mm |
Thickless of Film | 0.01-0.05mm |
Line speed of machineery | 150m/min |
Max extrusion capacity | 180kg/h |
Max rewind diameter | 400mm |
Screw diameter | 65/95/65mm |
L/D ratio of screw | 30:1 |
Motor power of main machine | 22/55/22KW |
Overall dimensions(LxWxH) | 11.5x5x4.1m |
Total weight | 14T |
1. Cooling roller adopt big diameter design and special double-decker runner. greatly improving the cooling effect of high-speed production to Guarantee good uniformity of cooling roll surface temperature.
2. Special alloy screw design and adopts high plasticizing and crystal point processing structure, ensure the film more stable, uniform, high transparency, strong tensile-strength and good viscosity.
3. The whole production line realized Fully automatic operation. Now we added automatic loading paper core and automatic unloading finished film systems, which the original design only automatic cutting roll device. ln this way will ensure the high quality high outputand stable production requirement, greatly saved the manpower cost.
4·Whole machine Parts and electric control parts are used domestic and foreign famous brand, which ensure its smooth Operation,low failure rate.
5·This Production line adopt melt metering pump technology and high precision pressure sensor system, which can stably and effective to Control the Pressure. it will highly improved film Horizontal and Vertical's tension strength and anti_puncture resistance and make the film meeting the high requirement for machine packing film
YAOAN machine shipment:
YAOAN factory panorama:
Packaging and shipping
PACKAGING | plastic film + stretch film + wooden case + drying agent. |
DELIVERY | About 50 days (all new parts) |
SHIPPING | We place and fix the machines well into container and check carefully before closing the container so as to ensure everything is ok for the shipment. (Use steel wire to fix machine and drying agent). We care each and every point so that our clients could receive the machines in perfect situation. |
What is our service system?
PRE-SALE | a. Detailed machine introduction; b. Suggest suitable turnkey solution as per clients requirements; c. Provide test production for reference; |
IN PRODUCTION | a. Supply layout drawing to clients for preparation; b. Suggest suitable building project for pipelines, electric wiring, air pipes, cooling cycle water etc; c. Keep the clients be informed of the production status; |
AFTER SALE | a. Send engineers to overseas for installation ,commissioning and training; b. Supply extruding products' material formula, recommend excellent supplier of the raw material per clients' requests; c. Offer help if any need from clients like spare parts need etc; d. Supply necessary technical support at request; |
Why choose YAOAN MACHINERY?
1. Profession: YAOAN only make plastic extruder since 1980s, extensive experience and professional team ensure our leading position in plastic extruder industry.
2. Quality: The quality of products is footstone of enterprise's constant development, always endeavoring to do still better, quality comes first, developing & innovative is our responsibilities;
3. Delivery: We optimize factory management, and improve production flow so as to shorten production period for you in biggest extent;
4. Cost control: We do best to lower down production cost by our inner management improvement, so as to ensure that our products are competitive enough in market, and to realize higher performance-price ratio of our products.
FAQ
Q1: What is the guarantee of the machine?
A1: The guarantee period of our machine is 12 months after the machine is installed well in buyer's factory;
Q2: What package do you use for the machine?
A2: Painted the machine with anti-corrosion oil, and then covered with plastic film, and then packed into wooden case or fixed onto wooden pallet as per clients' requirements, or shall be loaded into container with film packing. After fixed all machines, we will use drying agent to keep container inside dry.
Q3: Do you have instruction manual to guide us if i buy the machine?
A3: Yes, we supply detailed user manual for your reference. PLS read it carefully for guide. If there is still problem which could not be solved, PLS contact us, we are ready to help you anytime.
Q4: What is your service to overseas clients?
A4: We supply perfect overseas service. We shall send engineers to overseas for machine installation and commissioning and test production guide, and also training to the workers of the buyer. And we are ready to give technical support anytime.